Laboratory Fit-out
£1.8m
600m2
20 weeks
The project involved the initial isolation and strip-out of existing old laboratories. Technically challenging the design included for a full building extension to increase science capacity as well as for installation of two separate high-spec chemistry research laboratories incorporating large-scale walk-in and standard bench type fume cupboards.
T-SQUARED’s in-house design team undertook all necessary structural, architectural, mechanical and electrical design incorporating new dedicated systems along with connection to various elements of ‘house’ MEP infrastructure.
Installation works included the complete extension build along with the internal fabric fit-out with new walls, floors and ceilings. Dedicated HVAC systems were incorporated, these including specialist ATEX provisions along with an array of lab gases throughout the areas. New high efficiency lighting was provided along with small power and data extensions, LV boards, fire detection and access control systems.
Fully tested and commissioned this facility was handed over on programme.